Central AC-to-DC conversion
The transmitter converts input power once and distributes high-voltage DC from a central location.
A modular Fault-Managed Power platform that distributes continuously monitored high-voltage DC and converts it near connected loads.
Cence’s Digital Current™ architecture differs from packetized FMP platforms. Its transmitter performs a centralized AC-to-DC conversion and distributes continuously monitored high-voltage DC to receivers located closer to the loads.
Cence receivers regulate the high-voltage DC down to the voltage required by lighting, telecom equipment and other compatible devices. The platform also incorporates wireless monitoring and control through Cence software.
Current official transmitter specifications describe a four-channel modular system with rack- or wall-mount options, up to 3.2 kW per channel and programmable output up to 400 V DC. Cence’s broader platform material discusses operation up to 450 V DC depending on configuration.
The transmitter converts input power once and distributes high-voltage DC from a central location.
Transmitters and receivers monitor the circuit and interrupt power when a defined fault is detected.
Receivers convert the high-voltage DC to the voltage required by compatible endpoints; software adds monitoring and control.
Cence distinguishes Digital Current from packetized approaches by transmitting continuous, actively monitored DC.
Current specifications list up to 3.2 kW per channel, making load analysis and receiver configuration especially important.
The transmitter uses modular, hot-swappable channels and is offered in rack- and wall-mounted arrangements.
Cence promotes wireless monitoring, control, automation and optimization of connected loads through its application layer.
Suitability depends on load requirements, cable distance, receiver options, project economics and code approval.
A useful comparison begins with the project—not with a preferred product.
CAG.Works can help a project team compare Cence’s continuous-DC architecture with other FMP approaches, identify suitable loads, and organize early discussions with Cence, engineers, endpoint manufacturers and installers. Because product certification and specifications are evolving, the exact proposed equipment and its current listings should be verified during design.
Start a conversationUse these sources for current product specifications, listings and application guidance.
Product specifications, listings and installation requirements can change. Verify the exact proposed equipment with the manufacturer and the project’s Authority Having Jurisdiction.
You do not need to select the FMP platform first. Tell CAG.Works what the project needs to accomplish, and we can help organize the right technical conversation.